2
Table of Contents
Warnings and Cautions 3
A. Signal Words 3
1.Overview 4
1.1 Tests and record keeping 4
1.2 PC Connection 4
1.2.1 USB Connection 4
1.2.2 Ethernet Connection and E-mail 4
1.3 PC Requirements 4
1.4 Power Requirements 5
1.5 Sensor compatibility 5
1.6 Calibration Gas Cylinder Regulator Requirement 5
1.7 Dock Location 5
1.8 Delivery 5
1.9 Battery Charging 5
2.Installation 5
2.1 Installation Overview 5
2.2 IQ Administrator Pro and PostgreSQL Database Server Installation 6
2.3 IQ Database Manager Software Installation 6
2.4 IQ6 PC Software Installation 6
2.5 Install IQ Administrator Pro and PostgreSQL database. 7
2.6 Power and Connectivity 8
2.6.1 USB Connection 8
PC – Single Dock via USB 8
PC – Multi Dock via USB 8
2.6.2 Ethernet Connection 8
2.6.3 Power 8
2.7 Connecting the Calibration Gas Cylinder to the Dock(s) 8
2.7.1 Single Cylinder to Single Dock 8
2.7.2 Multiple Cylinders to Single Dock 9
2.7.3 Single Cylinder to Multiple Docks 9
2.7.4 Multiple Cylinders to Multiple Docks 10
2.7.5 Fresh Air Port Instructions 10
2.8 Initial PC- Dock Connection 10
2.8.1 PC screens 10
2.8.2 Dock screens 11
3.Software 11
3.1 Dock Status (USB Connection) 11
3.2 Dock Controls and Instrument Status 12
3.2.1 Dock Configuration 12
Hardware Configuration 13
Connection Speed 13
Audible Alarm Sensitivity Controls 13
AC Power 13
Pump Diagnostics 13
LCD Contrast Control 13
Status After Test 14
Battery 14
Calibration Interval 14
Gas Configuration 14
Comentarios a estos manuales